MANUFACTURING SERVICE

Heat Treatment

Heat treatment remains connected to material identity, required properties, dimensional stability and downstream manufacturing.

Heat Treatment

QUALIFICATION BASIS

Process capability is evaluated through material compatibility, specified cycle, batch control and required test evidence.

The exact control plan is agreed after the technical and commercial scope is understood.

Process capability is evaluated through material compatibility, specified cycle, batch control and required test evidence. 1
Process capability is evaluated through material compatibility, specified cycle, batch control and required test evidence. 2
01

What this can include

  • Normalising
  • Annealing
  • Quenching and tempering
  • Stress relieving
  • Surface or case hardening where specified
02

Materials covered

  • Carbon steel
  • Alloy steel
  • Stainless steel
  • Cast iron
  • Other materials suitable for the specified process
03

Processes covered by this service

  • Requirement review
  • Batch separation
  • Process confirmation
  • Sample or lot treatment
  • Downstream handover
04

Inspection and records

  • Process certificate
  • Batch or load record
  • Hardness test
  • Mechanical-property evidence where required
  • Dimensional review
05

Risks to clarify

  • Wrong material or cycle
  • Mixed batches
  • Hardness variation
  • Cracking or decarburisation
  • Distortion
06

Information to start

  • Material and standard
  • Required process
  • Target properties
  • Part geometry
  • Quantity
  • Required test evidence
  1. 01

    Treatment basis

    Confirm alloy, initial condition, specified process, target hardness or properties, distortion limits and required records or testing.

  2. 02

    Supplier-process assessment

    Assess the proposed supplier and furnace route against the material, part size, treatment method, process controls and evidence required by the project.

  3. 03

    Validation when specified

    Verify hardness, mechanical-property, microstructure, distortion or other specified evidence only where required by the drawing, standard or agreed inspection plan.

  4. 04

    Batch traceability and release

    Review the agreed batch or furnace identification, process records, test results, dimensional status and downstream readiness before release.